I’m tuning SSIS for better performance for a large client. The SSIS package I’m working with runs for over an hour and generates thousands of entries on the Progress / Execution Results tab. I wrote a small demo package, executed it, and show the results here to demonstrate:
Why is the Finished icon red?
This slows me down when I’m trying to find the needle-in-a-haystack error(s) that caused my package execution to fail. As I scroll through thousands of messages I have to pause and evaluate the shape and content of each red image. I could find errors much faster if they were the only red icons in the list, which could look something like this:
Why not make them black? or any color – other than red?
Andy